Skip to main content

Inner Sydney High School

Scope of Works

  • Undertake a full façade survey and develop a scope of works to ensure a defined maintenance free period.
    • Clean façade as required
      • Repoint façade as required
        • Supply new replacement carved stone façade embellishments
          • Replace rainwater goods
            • Replace decayed timber fascias, barge friezes and rafter ends as required
              • Repaint previously painted external surfaces
                • Reconstruct missing portions of the external façade uncovered as a consequence of the removal of obtrusive recent construction
                  • Design and Construct acoustically glazed steel observation portals after removal of previously existing link bridges
                    • Survey and repair existing leaking roofs
                      • Repair internal Kauri pine ceiling lining boards

                        Contract Value

                        $2,200,000.00

                        Client

                        NSW Government

                        Project Architect

                        FJMT

                        Project Contractor

                        Hansen Yunken Constructions

                        Contract Duration

                        6 months

                        Completion

                        November 2019